1. Field Regulations
a. Measuring and certifying bases, mound and plate distances and slopes
2. Infield Surface
a. Assess stability of infield mix
b. Grade infield with leveling attachment
c. Install infield soil conditioner with vitrified clay (red in color) to
improve water absorption and infiltration
d. Install new warning track extending around the backstop between the
1st base and 3rd base dugouts to increase safety and reduce wear.
e. Aerate, Overseed, Fer...
Continue reading ...